Product Description
The single-phase pole-mounted distribution transformers are specifically designed for the decentralization distribution network of servicing residential overhead distribution loads of town and countryside.
They are also suitable for light and diversified power applications. These transformers are designed for the application conditions normally encountered on electric utility power distribution systems.
Offers 2 basic transformer types and two kinds of metal core types Conventional type and Complete Self Protect type, and for the transformer core
Two types of materials are available: C.R.G.O. wound core and amorphous metal core.
Product Parameters
Rated Capacity (kVA) |
Voltage Ratio |
Vector Group |
No-load Losses (kW) |
Impedance (%) |
30 |
380V/3kV/6kV/11kV/33kV |
Dyn11/Yd11/Yyno |
0.1 |
4% |
50 |
380V/3kV/6kV/11kV/33kV |
Dyn11/Yd11/Yyno |
0.13 |
4% |
100 |
380V/3kV/6kV/11kV/33kV |
Dyn11/Yd11/Yyno |
0.2 |
4% |
200 |
380V/3kV/6kV/11kV/33kV |
Dyn11/Yd11/Yyno |
0.34 |
4% |
315 |
380V/3kV/6kV/11kV/33kV |
Dyn11/Yd11/Yyno |
0.42 |
4% |
500 |
380V/3kV/6kV/11kV/33kV |
Dyn11/Yd11/Yyno |
0.6 |
4% |
1000 |
380V/3kV/6kV/11kV/33kV |
Dyn11/Yd11/Yyno |
1.15 |
4.5% |
1250 |
6kV/11kV/33kV |
Dyn11/Yd11/Yyno |
|
4.5% |
2500 |
11kV/33kV |
Dyn11/Yd11/Yyno |
2.3 |
|
4000 |
11kV/33kV |
Dyn11/Yd11/Yyno |
2.8 |
|
No. |
Name |
1 |
Tank |
2 |
HV Bushing |
3 |
Hoisting and Mixing |
4 |
Support Lug |
5 |
Nameplate |
6 |
Stainless steel grounding nut M12×20 |
7 |
LV bushing |
8 |
Lightning Arrester bosses |
9 |
Tap changer |
10 |
GPS |
Related Products
Warehouse
Project Cases
Certifications
FAQ
Q: Could I have prices of your products?
A: Welcome. Please feel free to send us inquiry here. We will reply you within 24 hours.
Q: Can I get a sample before the bulk order?
A: Yes, we welcome sample order to test and check quality.Mixed samples are acceptable.
Q: Can we print our logo/ company name on products?
A: Yes, of course, we accept OEM, then need you to provide brand authorization to us
Q:Do you accept product customization?
A:Yes, of course, please provide specific drawings or parameters, we will quote you after evaluation
Q: What is the lead time?
A: The lead time depends on the quantities ordered, generally within 7-20 days after receiving the payment.
Q: What is your Trade Terms?
A: We accept EXW, FOB, CIF, FCA, etc.
Q: What is your payment method?
A: We accept T/T, Western Union, Paypal, irrevocable L/C at sight, etc
Q: Do you inspect the finished products?
A: Yes, each step of production and finished products will be came out inspection by QC department before shipping. And we will provide goods inspection reports for your reference before shipment
Q: How to solve the quality problems after sales?
A: Take photos of the quality problems and send to us for our checking and confirming, we will make a satisfied solution for you within 3 days.